See it work

The tedious parts, already done

A drawing priced into an estimate. A straight answer on where a job is up to. A weekly client update, drafted and waiting for you to edit and send. Here is what that looks like, on made-up examples.

From a drawing

Your takeoff is ready

Upload the plan and the quantities come back priced, line by line, with anything the drawing does not support left blank for you to confirm.

Sample
Ground floor plan · Lot 14 Kerferd Rd, Albert Park VIC
ItemQtyRateTotal
Concrete slab on ground, 100mm
03-30
148 m2$95.00$14,060.00
Face brickwork, external walls
04-20
96 m2$185.00$17,760.00
Timber wall framing, 90mm
06-10
132 m2$72.00$9,504.00
Plasterboard lining to walls
09-21
264 m2$48.00$12,672.00
Aluminium windows, supply and install
08-11
11 ea$680.00$7,480.00
Bathroom fixtures (fitout, to confirm)
22-40
2 ea
Priced total (5 of 6 lines)$61,476.00

Ask a question

Ask where the job’s at

A plain answer, and next to every claim, the record it came from. Nothing is made up, and you can open the source to check it.

Sample

Where is the Kerferd Road job up to, and is anything blocking us?

The frame stage is complete and signed off, with lock-up tracking to 18 August [1]. One item is waiting on you: the kitchen variation of +$4,200 is drafted and sitting with the client for signature [2]. The open request for information on the balustrade detail was answered by the engineer on 2 July, so nothing there is blocking the next claim [3].

  • [1]milestone · Frame complete · Frame stage signed off; lock-up due 18 Aug.
  • [2]variation · VO-014 Kitchen · Draft variation +$4,200 awaiting client signature.
  • [3]rfi · RFI-021 Balustrade · Answered by engineer 2 Jul; no longer open.

Every week, without the writing

Your weekly client update, drafted

The week’s progress written up as a first draft, in your client’s words. You read it, change anything you want, and send it when you are ready.

Sample

Weekly update · Kerferd Road · week ending 4 July

Hi Sarah, A quick update on your build this week. The frame is up and has passed its check, so we are on track for lock-up by 18 August. Windows are booked in for the week after next. There is one thing for you: the kitchen change we discussed comes to an extra $4,200. I have sent it through for you to look over and sign when you are happy. Everything else is running to plan. I will send the next update this time next week. Thanks, Dan

Nothing sends without you. Every answer cites the record it came from.